For District 3 Commission Vacancy Information, click here.

Development Areas

Available Development Areas

  • Master Plan complete
  • 150 acres available (300 total acres)
  • One mile north of the Pasco Processing Center
  • Rail spur onsite
  • Zoned I-2
  • Excellent access to Highway 395 and BNSF rail
  • Six miles from Tri-Cities Airport
  • Natural gas and electrical transmission
  • Utilities in place fall 2023
  • Buildout projected over 20 years

Possible Future Development

  • Food Processing
  • Support Businesses
  • Advanced Manufacturing
  • Cold Storage
  • Distribution & Logistics

Download Marketing Cut Sheet

  • 450 acres of available land
  • Future development geared to aerospace industries
  • Master plan completed in 2023
  • Ongoing site evaluations and infrastructure design
  • Learn more and join the conversation to shape the AIM Center by visiting tricitiesaim.com
  • Commercial and Retail Opportunities
  • Restaurant and Hospitality sites available
  • 90 acres adjacent to the airport
  • Easy access to I-182
  • Zoned I-1 - For lease only
  • Aviation Sites - 30 acres (21 parcels)
    • 0.5- to 1-acre parcels
    • Possible future development:
      • Airport-related functions
  • Non-aviation Sites - 56 acres (22 parcels)
    • 0.33- to 5.36-acre parcels
      • Possible future development:
        • Light industrial
        • Non-airport-related industrial
        • Commercial development

Download Marketing Cut Sheet
Download Lots 52 & 55 Rack Card

  • East of the airport terminal
  • 500,000 square feet building space
  • Possible future development:
    • Agricultural
    • Small business
    • Warehouse
    • Manufacturing
    • Local government support services
  • 25 acres available (55 acres total)
  • Adjacent to Hwy 395
  • Zoned I-2
  • Nearby access to rail, barge, highway, and air
  • Possible future development:
    • Largescale food processing
    • Other large industrial
    • Support businesses
  • Water, sewer, power, and gas accessible

Download Marketing Cut Sheet

  • 28-acre riverfront site
  • Located northeast corner of the Ed Hendler Cable Bridge
  • 300-foot Wharf Dock rehabilitation planned
  • Mixed Use Development welcome
  • Equipped with utilities and road network
  • Possible future development:
    • Light industrial
    • Office
    • Commercial
  • 101 acres
  • Riverside property
  • Port of Pasco Headquarters
  • Landscape park and open space with paved trail leading to Sacajawea Park
  • City utilities
  • 110 stalls, including five handicap parking stalls
  • Easy access to I-182
  • Zoned I-1 & I-3
    • Current use
      • Office space
      • Public recreation
      • Municipal services
    • Possible future development:
      • Industrial
      • Office
      • Public waterfront
  • 370 acres of riverfront property
  • 1.3 million sq. ft. of improved buildings
  • Small buildings, warehouses, and development land for lease
  • Easy access to rail, highway, airport and barge
  • Eight, 240,000 sq. ft., heavy frame warehouses, each with four bays
  • Covered docks for truck and rail
  • Possible future development:
    • Industrial
    • Speculative development
    • Build-to-suit arrangements

Download Marketing Cut Sheet

Big Pasco Industrial Center

Sold Development Areas

  • 250 acres along US-395
  • Prime location within the fertile Columbia Basin
  • Includes a City-owned industrial wastewater treatment plant; sewer, water and natural gas systems which exceed standard capacity; and an electrical substation
  • Central location with easy links to rail, barge, highway, and air